railway news

Visakhapatnam Station: Arrival timings of 21 trains revised from October

Visakhapatnam Station: Arrival timings of 21 trains revised from October

The East Coast Railway has introduced revised arrival timings for several train services at Visakhapatnam Railway Station. These updates, which…

2 months ago

Visakhapatnam to Araku train to run with extra coaches in September

To clear the rush of waitlisted passengers, East Coast Railway has announced that the train going from Visakhapatnam to Araku…

3 months ago

Construction of new railway zone headquarters to start in Visakhapatanam soon

Visakhapatnam Railway Zone will soon become a reality, as State and Central governments have already started taking steps in the…

4 months ago

Accident Alert: Visakhapatnam to Amritsar Bound Train Collides With Car At Madhya Pradesh

A tragic train accident occurred near Jaithari, Madhya Pradesh, when a speeding car violated the railway crossing, and struck the…

9 months ago

Visakhapatnam-Kirandul Trains to be short terminated; Check final destination and other details

In light of safety considerations, the Indian Railways has announced significant changes to the train schedule of several express vehicles…

9 months ago

Andhra Train Collision 2023 Due to Driver, Assistant, watching cricket match: Ashwini Vaishnaw

The Union Minister of Railways of India, Ashwini Vaishnaw revealed on Saturday, that the loco and assistant pilots of one…

10 months ago

Visakhapatnam-Kirandul-Visakhapatnam Trains Cancelled, Diverted; Details For Passengers

Due to a failure of Over Head Equipment (OHE) in the Chimidipalli-Borraguhalu section of the Kottavalasa-Kirandul line, express trains traveling…

10 months ago

Tatanagar-Ernakulam Express To Run Daily From 7 March; Key Details To Know

The South Eastern Railways has recently announced a significant increase in the frequency of Train Nos 18189/18190 Tatanagar-Ernakulam-Tatanagar Express in…

10 months ago

Several Trains Rescheduled On 29 February Between Brahmapur, Naupada

In a bid to carry out essential infrastructure work related to the Limited Height Subway between the Brahmapur and Naupada…

10 months ago

Railways announce cancellation and rescheduling of trains owning to safety works at the Waltair Division

In connection with traffic power blocks on 8 January 2024 for construction of Limited Height Subway works at Level Crossing…

12 months ago